Shanghai International Circuit (F1)

Shanghai International Circuit was completed in May 2004, with a total construction area of approximately 150,000 m² for its main and auxiliary buildings, including grandstands, race control tower, administration tower, media center, sky restaurant, team paddock, and maintenance area. In 2006, the Shanghai F1 International Circuit project purchased two batches of CEEG SG series dry-type transformers. The equipment has performed reliably in operation, providing strong power support for the successful execution of this world-renowned international racing event.

Administrator Administrator Published on 2024-08-15

Beijing Olympic Doping Control Center

The National Olympic Sports Center Anti-Doping Testing Center is the largest and world-class doping laboratory in Asia, responsible for doping control during the 2008 Beijing Olympic Games as well as testing support for national team Olympic preparation. CEEG YB-500/10 prefabricated substation stood out among multiple competitors and successfully won the bid due to its strong integrated design capability and convenient maintenance and operation features, ensuring reliable power support for the facility.

Administrator Administrator Published on 2024-08-15

Qingdao Olympic Sailing Command Center

The Qingdao Olympic Sailing Center for the 29th Olympic Games is located on the coast of Fushan Bay in Qingdao, Shandong Province, at the former site of the Beihai Shipyard. The total land area is 45 hectares, with approximately 30 hectares used during the Olympic competitions. As a key national Olympic project, the Qingdao Olympic Sailing Command Center had extremely strict procurement standards for electrical equipment such as transformers. After evaluation by multiple technical experts, the project ultimately selected multiple CEEG YB-800/10 European-style prefabricated substations and SC10-50/6 transformers.

Administrator Administrator Published on 2024-08-15

National Olympic Sports Center

The National Olympic Sports Center Comprehensive Training Hall served as the training base for China’s national men’s and women’s tennis and wrestling teams during the 2008 Olympic Games. During the Games, it was used as a venue for artistic gymnastics, trampoline, and handball competitions. After the Olympics, it was transformed into a first-class sports facility in Beijing, serving as a multifunctional civic center integrating sports events and cultural entertainment. For this project, multiple CEEG SG10-800/10 dry-type transformers were selected. Project technical experts highly recognized the CEEG brand and expressed strong satisfaction with the operational performance of the equipment, particularly praising its noise control technology and NOMEX insulation system.

Administrator Administrator Published on 2024-08-15

Beijing Olympic Traffic Command Center

The Olympic Traffic Command Center is located north of Fuchengmen North Street in Xicheng District, adjacent to the south side of the current Traffic Management Bureau, with a total construction area of 19,876 m². It provided first-class traffic management support for the capital before and during the 2008 Olympic Games. For this project, several CEEG SCB10-1600/10 epoxy resin dry-type transformers were selected. Since commissioning at the end of 2006, the equipment has operated with high stability, and both product quality and service have received positive feedback from users.

Administrator Administrator Published on 2024-08-15

Beijing Winter Olympics Competition Venues

The Beijing Winter Olympic Games opened on February 4, 2022 and closed on February 20, 2022. The Games featured 7 sports, 15 disciplines, and 109 events. Beijing Winter Olympics made history with an unprecedented level of digitalization, enabling more people to experience Olympic culture and events, and setting new technological standards for future Games. The competition venues of the Beijing Winter Olympics adopted CEEG’s independently developed upgraded amorphous alloy dry-type transformers. With ultra-low losses and significant energy-saving performance, the products provided green and efficient power support for the Olympic venues.

Administrator Administrator Published on 2024-08-15